Over the last ten years numerous corporations, universities and organizations have contracted Duncan Seawall for their marine construction needs. We have also expanded our base of clients to include commercial and municipal projects over the entire state of Florida.
Duncan Seawall has become the area’s largest and most respected marine construction company – creating a reputation for excellent service and quality workmanship at a fair price.
A few of our clients for which we have provided numerous services over the past few years are listed below:
Riviera Dunes Marina, Palmetto, FL
Approximately 1.5 miles of Rock Revetment
20,000 Cubic Yards of Dredging
Concrete Floating Docks
Boat Lifts Ranging in Size from 7,000-lb. to 74,000-lb.
Concrete and Wood Mooring Pilings
Tampa Bayside Marina, Tampa, FL
Steel Seawall
Fork Lift Pad
Foundation Pilings for Restaurant
Dredging
Concrete Floating Docks
Turtle Cove Marina, Tarpon Springs, FL
1,100’ of Concrete Seawall Replacement
1,200 Cubic Yards of Dredging
Fixed Wood Docks
Fixed Concrete Docks
Floating Aluminum Docks
Concrete and Wood Mooring Pilings
Mainsail Marina, Holmes Beach, FL
6 Boat Lifts Of Various Sizes
4,800 Cubic Yards Of Dredging
640' Of Concrete Seawall
Marina Jack, Sarasota, FL
16,000 Cubic Yards Of Dredging
Aluminum Finger Piers
Wood Mooring Pilings
8 Boat Lifts
Various Repair Projects
Tampa Yacht and Country Club, Tampa, FL
16,000 Cubic Yards of Dredging
Wood Mooring Pilings
Venice Coast Guard Station, Venice, FL
Steel Seawall
Cap and Tieback System
Davis Island Yacht Club, Tampa, FL
1,100 Cubic Yard Dredge
Floating Wood Docks
Fixed Wood Docks
Wood Mooring Piling Replacement
The Field Club, Sarasota, FL
1,800 Cubic Yard Dredge
Fixed Wood Docks
Wood Mooring Pilings
Longboat Key Moorings, Longboat Key, FL
Concrete Fixed Docks
Concrete Floating Docks
Wood Mooing Pilings
Concrete Mooring Pilings
1,000 Cubic Yard of Dredge
Reef Balls
Channel Marker Installation
Electrical Upgrades
Longboat Key Police Department, Longboat Key, FL
Two 12,000-lb. Boat Lifts
City of Sarasota Police Department, Sarasota, FL
Two 20,000-lb. Boat Lifts
West Coast Inland Navigation District (W.C.I.N.D.)
25,000 Cubic Yards of Dredging in Phillippi Creek
16,000 Cubic Yards Dredging in the Intra Coastal Waterway
Florida D.O.T. & Hendry Corporation All over Florida
21,000 Tons of Rock Revetment & Scour Protection
Island Way Grill Clearwater, FL
700 Cubic Yards of Dredging
Rock Revetment
Cortez Cove Boatyard & Marina, Bradenton, FL
11,000 Cubic Yards of Dredging
Complete Wood Dock Replacement
Wood Mooring Pilings
Bombardier/Seadoo Test Facility, Melbourne, FL
53,000 Cubic Yards of Hydraulic Dredging
Complete Marina Facilities
Sarasota Sailing Squadron, Sarasota, FL
Fixed Wood Docks
Floating Wood Docks
Floating Aluminum Docks
Floating Concrete Docks
700 Cubic Yards of Dredging
Boat Ramp
Boat Hoist to Transfer Boats from Trailer into the Water
Wave Attenuator
Marine Max Corporation, Clearwater, FL
Steel Seawall with Cap and Tieback System (Naples ,FL)
Concrete Cap and Tieback System (City Island, FL)
Fixed Concrete Docks (Naples, FL)
Fixed Wood Docks (Gulfport, City Island, Venice and Naples, FL)
Boat Lifts (City Island and Venice, FL)
Wave Attenuator (City Island, FL)
Travel Lift Pad (Naples and City Island, FL)
Wood Mooring Pilings (numerous locations)
Dry Dock Restaurant, Longboat Key, FL
Fixed Wood Docks
Seawall Cap Repair
Drainage
Wood Mooring Pilings
Regatta Point Marina, Palmetto, FL
Fixed Wood Docks
Wood Mooring Pilings
Various Boat Lifts
Ringling Causeway, Sarasota, FL
560’ of Steel Seawall with Concrete Cap
500 Additional Feet of Concrete Cap
120,000 Ton Rock Revetment
Aluminum Railing
Concrete Curbing
Manatee County Government, Bradenton, FL
Jiggs Landing
Concrete Fixed Dock
Wood Fixed Docks
Concrete Boat Ramp
Fishing Pier
Floating Aluminum Kayak Ramp
Floating Aluminum Dock
Lake Manatee Water Facility
Fixed Aluminum Walkway
Floating Aluminum Docks
Wave Attenuator
Wood Pilings
Leffis Key
Approximately 800’ of Boardwalk replacement
State Road 64 Boat Ramp
Concrete Fixed Dock
Concrete Boat Ramp
Channel Marker Installation
Bryn Mawr Canal Dredging
1,700 Cubic Yards of Dredging Behind Residences
7 Mile Reef Deployment
Transport and Place Approximately 700 Tons of Concrete Rubble
City of Sarasota Government, Sarasota, FL
Ken Thompson Park
Concrete Boat Ramps
Fixed Concrete Docks
Dredging
Parking Lot
Drainage System
Restroom Facilities
Landscaping
Bayfront Park
300’ of Vinyl Seawall and Concrete Cap
80 Additional Feet of Concrete Seawall Cap
800 Tons of Rock Revetment
Restroom Facilities
Sidewalk
Landscaping
Indian Rocks Beach Park
400’ of Armorflex Matting
Composite Decking at Sitting Area
Landscaping
Town of Longboat Key Government, Longboat Key, FL
50’ of Concrete Seawall, Seawall Cap and Tieback System
Culvert Installation
Culvert Repair
Erosion Repair